
TBR Ceramic Roller PLC Control Double Heating Section Flat Tempered Glass Making Machine for Solar Glass Appliance Glass
Guangdong Shunde Timbery Technology Co., Ltd.- Heating Method:Electric Heating
- Heating Chamber:2
- Heating Balance:Yes
- Convection:No
- Blower:2 Sets
- PLC:Omron
Base Info
- Model NO.:TG1550-2
- Screen:Philips
- Application:Architecture, Furniture, Automobile, Household Ap
- Type:Glass Tempering Furnace
- Certification:CE, ISO
- Structure:Horizontal
- Control System:PLC
- Condition:New
- Glass Washing Machine Type:Horizontal Glass Tempering Furnace
- Glass Edging Machine Type:Flat Tempering Furnace
- Transport Package:Container
- Specification:CE
- Trademark:Timbery
- Origin:Guangdong
- HS Code:8419899090
- Production Capacity:4 Set, Month
Description
Basic Info.
Model NO. TG1550-2 Screen Philips Application Architecture, Furniture, Automobile, Household Ap Type Glass Tempering Furnace Certification CE, ISO Structure Horizontal Control System PLC Condition New Glass Washing Machine Type Horizontal Glass Tempering Furnace Glass Edging Machine Type Flat Tempering Furnace Transport Package Container Specification CE Trademark Timbery Origin Guangdong HS Code 8419899090 Production Capacity 4 Set/ MonthProduct Description
GUANGDONG SHUNDE TIMBERY TECHNOLOGY CO., LTD.
Series: Flat glass Double Heating Chamber Tempering Furnace
Optional Radiation Glass Tempering Furnace Models (BG Series):
Model | MAX | MIN | GLASS THICKNESS | KVA | M²/H |
TG0932 | 900x3200mm | 130x60mm | 2.85-12mm | ≥500 | 65 |
TG1240-2 | 1250x4000mm | 180x100mm | 2.85-19mm | ≥700 | 113 |
TG1550-2 | 1500x5000mm | 220x150mm | 2.85-19mm | ≥900 | 168 |
TG1655-2 | 1650x5500mm | 230x150mm | 2.85-19mm | ≥1100 | 203 |
TG1680-2 | 2000x5000mm | 230x150mm | 2.85-19mm | ≥1100 | 285 |
TG2050-2 | 2000x5000mm | 250x100mm | 4-19mm | ≥1000 | 230 |
TG2242-2 | 2200x4200mm | 300x150mm | 4-19mm | ≥1000 | 230 |
TG2450-2 | 2400x5000mm | 300x150mm | 4-19mm | ≥1250 | 270 |
TG2460-2 | 2400x6000mm | 300x150mm | 4-19mm | ≥1600 | 3100 |
Delivery:
90 days after received the deposit payment.
Installation, commissioning for 20 days.
Installation:
1-2 engineers for installation guidance, commissioning and training free.
Provide operation manuals, including electric diagrams, guidance of operation and maintenance, main process parameter setting.
Warranty:
1 year warranty.(Warranty start from finishing commissioning.)
Seller will be responsible for the non-artificial damage devices (not including wearing parts), provide technical services and spare parts, and assist to solve the problems during production. Seller should give assistance buyer to solve the problem timely when failures happen.
After-sell Service
Received customer failure report will response rapidly:
1: Based on customer's description, solve problem by telephone or E-mail try to resolve issues as soon as possible.
2: If we can't solve machine problem by telephone , our customer service center will promptly sent our technician to customer's factory to supply full solution for solving this trouble.
